PRODUCTION FACILITIES
 

Electric power plants:


# PLANTS YEAR OF COMMISSIONING INSTALLED ELECTRIC CAPACITY, MW INSTALLED THERMAL CAPACITY, GCAL/H
I
"Southern Generation"
440.9 2'323.8

Belgorod Region
149.0 570.8
1 Belgorod TPP (thermal power plant) 1938 60.0 360.4
2 GT-TPP (gas turbine TPP) "Luch" 2005
60.0 62.4
3 Gubkin TPP 1954
29.0 148.0

Kursk Region
291.9 1'753.0
4 TPP-1 1955
175.0 1'043.0
5 TPP Quadra 2011
116.9 710.0
II
"Voronezh RG" (Regional Generation)
265.0 1'966.0
6 TPP-1 1933
138.0 1'181.0
7 TPP-2 1957
127.0 785.0
III
"Eastern Generation"
817.0 2'318.6

Lipetsk Region
582.0 1'371.6
8 TPP-2 1978
515.0 1'002.0
9 Elets TPP 1955
57.0 217.6
10 Dankov TPP 1961
10.0 152.0

Tambov Region
235.0 947.0
11 Tambov TPP 1954
235.0 947.0
IV
"Central Generation"
1'344.5 3'296.1

Kaluga Region
41.8 110.1
12 Kaluga TPP 1948
41.8 110.1

Tula Region
545.7 1'082.4
13 Novomoskovsk SDPS 1934
323.7 412.0
14 Alexin TPP 1941
62.0 150.0
15 Efremov TPP 1931
160.0 520.0

Ryazan Region
110.0 331.0
16 Dyagilev TPP 1958
110.0 331.0

"Orel RG"
372.0 998.6
17 Orel TPP 1946
330.0 725.0
18 Livny TPP 1958
42.0 273.6

Smolensk Region
275.0 774.0
19 Smolensk TPP-2 1973
275.0 774.0

TOTAL for QUADRA
2'867.4 9'904.5
20 Kursk TPP-4* 1934
4.8 395.0
21 Shchekinskaya SDPS* 1950
400.0 0.0

TOTAL for TGS (plants)
404.8 395.0

TOTAL
3'272.2 10'299.5

*Plants included in the group JSC «Quadra - Power generation»

Thermal grid enterprises, thermal grids of plants (*)


THERMAL GRIDS NUMBER OF BOILERS INSTALLED CAPACITY, GCAL/H LENGTH OF THERMAL GRIDS IN TERMS OF ONE-PIPE LENGTH, KM
Southern Generation 3 610.0 15.1
Belgorod Region 610.0  
Boilers 3 610.0
Kursk Region 15.1
*Kursk TPP-1

5.0
*TPP Quadra

10.1
Eastern Generation 121 1'614.0 1'265.4
Lipetsk Region 121 1'614.0 994.3
*Elets TPP  
 
104.5
*Dankov TPP  
 
66.6
Thermal grids (Lipetsk)3 1'040.0 8.4
LGEK 5 147.0 0
Kommunteploenergo 45 152.1 106.4
Elets Thermal Grids 50 151.9 79.6
North-eastern Thermal Grids 18 123.0 129.5
Tambov Region 1.4
*Tambov TPP  
 
1.4
Central Generation 5 331.4 143.3
Tula Region 3 132.6 66.4
*Novomoskovsk SDPS  
 
55.6
IHB (industrial heating boiler) of Efremov TPP1 67.2 10.8
BMB (block-modular boiler)1 5.40
Boiler #1 (Novomoskovsk)1600
Kaluga Region
10.7
*Kaluga TPP

10.7
RyazanRegion 1 7.5 62.2
Boiler "Iskra" 1
7.5
5.6
*Dyagilev TPP

56.6
Orel region 4.0
*Livny TPP

4.0
Smolensk TPP 1 191.3 56.6
Boiler pf Smolensk TPP-2 1
191.3
0.0
TOTAL for QUADRA 129 2'555.4 654.8

Thermal grid enterprises of TGC


THERMAL GRIDS NUMBER OF BOILERS INSTALLED CAPACITY, GCAL/H LENGTH OF THERMAL GRIDS IN TERMS OF ONE-PIPE LENGTH, KM
Belgorod TGC 153 435.5 1'148.3
Voronezh TGC 2 310.0 684.2
Kursk TGC 4 5.2 1'060.9
Orel TGC 312.4
Lipetsk TGC 3 23.2 1'064.68
Smolensk TGC  
 
151.3
LLC "Shchekinskaya SDPS" 55.3
TOTAL 162 773.90 4'477.08
 